DEPLOYDatabase

Data center facility

Peak Mining Corpus Christi (Site 1)

Northern Data · Corpus Christi. Every figure below is individually sourced and dated.


Facility record

operating

Status

crypto hpc

Type

300 MW

Critical IT

2024

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 300 (claimed) · source
  • record: Peak Mining Corpus Christi (Site 1) (reported) · source
  • status: Phase 1 of ~100MW ramped from Q1 2024; 33-acre, 300MW site (Peak Mining, a Northern Data Group company) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Peak Mining Corpus Christi (Site 1)?
Peak Mining Corpus Christi (Site 1) is a data center facility record on the DEPLOY registry, in Corpus Christi. Every fact on the record is individually sourced and dated.
Who operates Peak Mining Corpus Christi (Site 1)?
Northern Data operates Peak Mining Corpus Christi (Site 1), per the sourced record on the DEPLOY registry.
Is Peak Mining Corpus Christi (Site 1) operating?
Peak Mining Corpus Christi (Site 1) is recorded as operating on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Peak Mining Corpus Christi (Site 1)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Peak Mining Corpus Christi (Site 1) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Peak Mining Corpus Christi (Site 1): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/peak-mining-corpus-christi-tx-site-1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces