Overview
Rowan Digital Infrastructure is a hyperscale data center developer headquartered in Denver, Colorado, that develops powered land and build-to-suit data center campuses for hyperscale, AI and cloud customers. It was established in 2020 by Quinbrook.
Verified record
- Verified deployments
- None on file
- Active incidents
- None on file
Data & sources
Web sources
1
1 source backing this record.View all →
Partnerships
Every company Rowan Digital Infrastructure has built with, alongside the ones only announced in a press release.
Most-frequent partners
- 1AWS1× joint30 total
Most recent
Relationships
Safety record
No incidents on record for Rowan Digital Infrastructure.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Full safety record: incidents, sourcing, and exposure data →
Rowan Digital Infrastructure on the data-center map
Every verified data center Rowan Digital Infrastructure operates that has a mapped coordinate (12 total). Filled circles are Tier-2 facilities and Tier-1 campuses under this operator; click any pin to open its record.
Rowan Digital Infrastructure data centers (12)
- Rowan Bauxite II (Quantum Frederick Campus)Adamstown · planned
- Rowan Bauxite III (Quantum Frederick Campus)Adamstown · planned
- Rowan Project RangerTemple · planned
- Rowan Project StampedeTemple · planned
- Bauxite (Quantum Frederick Campus)Adamstown · 630 MW
- CincoSan Antonio · 300 MW
- PercheronBoardman · 300 MW
- Project TempleTemple · 300 MW
- Rowan Bauxite I / AWS BWI (Quantum Frederick Campus)Adamstown · 300 MW
- Rowan Project TempleTemple · 300 MW
- Rowan Temple Data Center CampusTemple · 300 MW
- MeriwetherForest Grove · 150 MW
AI data centers Rowan Digital Infrastructure operates or is a party to, from the DEPLOY data center registry.
Recent coverage
Rowan Digital Infrastructure in third-party press
Britain’s data centre gap is a sovereignty question, not just a grid one
The Pipeline: Blackstone’s $310bn ‘front row seat’ to AI, Harbert scores $450m interim close and KKR makes $1.5bn towers investment
Tech Moves: Microsoft execs depart; TerraClear, UserTesting, EchoMark and Read AI add leaders
Partnerships
1 total
Every company Rowan Digital Infrastructure has built with, alongside the ones only announced in a press release.
Most recent
Most-frequent partners
- 1AWS1× joint30 total
Funding rounds (1)
- Corporate credit facilities (November 2026)2026-11-12
$1.5B
Investors: Apterra Infrastructure Capital (lead), Citibank, N.A. (lead), Mizuho Bank, MUFG Bank, Goldman Sachs Bank USA, Societe Generale, Sumitomo Mitsui Banking Corporation, Huntington National Bank
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdAug 19, 2026
Added to the verified registry
Sources (1)
Common questions
What is Rowan Digital Infrastructure?
What does Rowan Digital Infrastructure make?
Is Rowan Digital Infrastructure publicly traded?
How can I invest in Rowan Digital Infrastructure?
Where is Rowan Digital Infrastructure headquartered?
Who owns Rowan Digital Infrastructure?
Is Rowan Digital Infrastructure a top robotics company?
When was Rowan Digital Infrastructure founded?
Is Rowan Digital Infrastructure safe?
Methodology: Verified · 1 source (no primary) · last reviewed 2026-10-22
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-10-22
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Rowan Digital Infrastructure.In the press
Recent coverage mentioning Rowan Digital Infrastructure from third-party publications. Automatically surfaced; not part of the verified registry record.
Britain’s data centre gap is a sovereignty question, not just a grid one
The Pipeline: Blackstone’s $310bn ‘front row seat’ to AI, Harbert scores $450m interim close and KKR makes $1.5bn towers investment
Tech Moves: Microsoft execs depart; TerraClear, UserTesting, EchoMark and Read AI add leaders
Morning Wrap: ASX set to fall, oil higher as Trump changes deadline
Denver-area startups to watch in 2026: AI, clean energy, quantum
Rowan Digital Infrastructure : Powering Progress Sustainably
Data Center Shut Down after Worker Killed
Tech Moves: Former leaders at Qualtrics and AWS land CEO roles; VertueLab adds board member
Machine-readable surfaces
- Markdown mirror: /companies/rowan-digital-infrastructure.md
- RSS feed: /companies/rowan-digital-infrastructure/feed.xml
- JSON-LD: embedded in this page’s head
- REST API: /v1/companies/35ecfcdd-ba8f-4a16-95f2-c628472e504b
- Revision history: /companies/rowan-digital-infrastructure/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Heat Index
Serious52/100
A composite of competitive footprint, funding, press velocity, active partnerships, and supply-chain edges. Different from the Intelligence score below (which is per-form-factor productization). Non-robotics companies cap at 25.
Reality vs attention
Not enough verified signal yet to place Rowan Digital Infrastructure against peers. Reality and attention percentiles publish once the underlying record clears its data floor.
6-month trend
Analysis
Well-capitalized with $1.5B raised. Limited public visibility and press coverage relative to peers.
Signal flags
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Nov 20, 2026