Data center facility

Nexus Apex Hubbard (DFW HB1)

Nexus Data Centers · Hubbard. Every figure below is individually sourced and dated.


Facility record

under construction

Status

hyperscale

Type

Hubbard

Location

600 MW

Critical IT

491,380 sqft

Building

2027

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 491,380 (reported) · source
  • critical it mw: 600 MW on-site natural gas generation (claimed) · source
  • record: Nexus Apex Hubbard (DFW HB1) (reported) · source
  • status: under construction; build Jan 2026-Oct 2027, Anthropic anchor tenant (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Nexus Apex Hubbard (DFW HB1)?
Nexus Apex Hubbard (DFW HB1) is a data center facility record on the DEPLOY registry, in Hubbard. Every fact on the record is individually sourced and dated.
Who operates Nexus Apex Hubbard (DFW HB1)?
Nexus Data Centers operates Nexus Apex Hubbard (DFW HB1), per the sourced record on the DEPLOY registry.
Is Nexus Apex Hubbard (DFW HB1) operating?
Nexus Apex Hubbard (DFW HB1) is recorded as under construction on the DEPLOY registry, with 600 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Nexus Apex Hubbard (DFW HB1)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Nexus Apex Hubbard (DFW HB1) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Nexus Apex Hubbard (DFW HB1): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/nexus-apex-hubbard-hb1-hill-county-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces