DEPLOYDatabase

Data center facility

Laredo Behind-the-Meter Hydrogen Data Center

Green Hydrogen International · Laredo. Every figure below is individually sourced and dated.


Facility record

planned

Status

hyperscale

Type

Laredo

Location

300 MW

Critical IT

1,000,000 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Laredo Behind-the-Meter Hydrogen Data Center (reported) · source
  • status: planned - first phase 300MW / 1M sq ft, up to 5GW, powered via adjacent Hydrogen City project (claimed) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Laredo Behind-the-Meter Hydrogen Data Center?
Laredo Behind-the-Meter Hydrogen Data Center is a data center facility record on the DEPLOY registry, in Laredo. Every fact on the record is individually sourced and dated.
Who operates Laredo Behind-the-Meter Hydrogen Data Center?
Green Hydrogen International operates Laredo Behind-the-Meter Hydrogen Data Center, per the sourced record on the DEPLOY registry.
Is Laredo Behind-the-Meter Hydrogen Data Center operating?
Laredo Behind-the-Meter Hydrogen Data Center is recorded as planned on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Laredo Behind-the-Meter Hydrogen Data Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Laredo Behind-the-Meter Hydrogen Data Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Laredo Behind-the-Meter Hydrogen Data Center: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/laredo-hydrogen-data-center-webb-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces