DEPLOYDatabase

Data center facility

TeraWulf / Fluidstack Abernathy Campus

TeraWulf (Fluidstack JV) · Abernathy. Every figure below is individually sourced and dated.


Facility record

under construction

Status

crypto hpc

Type

Abernathy

Location

168 MW

Critical IT

2026

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 168 MW critical IT / 240 MW gross (claimed) · source
  • record: TeraWulf / Fluidstack Abernathy Campus (reported) · source
  • status: under construction; new 120-acre AI/HPC campus, delivery H2 2026, Anthropic tenant (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is TeraWulf / Fluidstack Abernathy Campus?
TeraWulf / Fluidstack Abernathy Campus is a data center facility record on the DEPLOY registry, in Abernathy. Every fact on the record is individually sourced and dated.
Who operates TeraWulf / Fluidstack Abernathy Campus?
TeraWulf (Fluidstack JV) operates TeraWulf / Fluidstack Abernathy Campus, per the sourced record on the DEPLOY registry.
Is TeraWulf / Fluidstack Abernathy Campus operating?
TeraWulf / Fluidstack Abernathy Campus is recorded as under construction on the DEPLOY registry, with 168 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on TeraWulf / Fluidstack Abernathy Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track TeraWulf / Fluidstack Abernathy Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). TeraWulf / Fluidstack Abernathy Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/terawulf-fluidstack-abernathy-hale-county-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces