Data center facility
West Texas AI Infrastructure Campus
Circe Energy · Permian Basin. Every figure below is individually sourced and dated.
Facility record
On the data center map
No mappable coordinate is recorded yet. Location: Permian Basin.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: announced
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is West Texas AI Infrastructure Campus?
Who operates West Texas AI Infrastructure Campus?
Is West Texas AI Infrastructure Campus operating?
How verified is the data on West Texas AI Infrastructure Campus?
Deploy Watch
Track West Texas AI Infrastructure Campus on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). West Texas AI Infrastructure Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/circe-energy-west-texas-ai-infrastructure-campus-permian
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/circe-energy-west-texas-ai-infrastructure-campus-permian.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/circe-energy-west-texas-ai-infrastructure-campus-permian
- Data documentation: /data
- Query this programmatically: Deploy MCP