DEPLOYDatabase

Data center facility

West Texas AI Infrastructure Campus

Circe Energy · Permian Basin. Every figure below is individually sourced and dated.


Facility record

announced

Status

hyperscale

Type

Circe Energy

Operator

1100 MW

Critical IT

On the data center map

No mappable coordinate is recorded yet. Location: Permian Basin.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 1.1 GW by 2030 (2 GW gas capacity ordered) (claimed) · source
  • record: West Texas AI Infrastructure Campus (reported) · source
  • status: announced; 1,950-acre platform, starts 10 MW 2026 scaling to 1.1 GW by 2030 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: announced

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is West Texas AI Infrastructure Campus?
West Texas AI Infrastructure Campus is a data center facility record on the DEPLOY registry, in Permian Basin. Every fact on the record is individually sourced and dated.
Who operates West Texas AI Infrastructure Campus?
Circe Energy operates West Texas AI Infrastructure Campus, per the sourced record on the DEPLOY registry.
Is West Texas AI Infrastructure Campus operating?
West Texas AI Infrastructure Campus is recorded as announced on the DEPLOY registry, with 1100 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on West Texas AI Infrastructure Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track West Texas AI Infrastructure Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). West Texas AI Infrastructure Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/circe-energy-west-texas-ai-infrastructure-campus-permian

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces