Overview
Nightpeak Energy develops, owns and operates power plants, including peaking natural gas and battery storage, and is backed by Energy Spectrum. It is based in Oakland, California, and operates the Bocanova battery storage site in southeastern Texas.
Reality check
Bocanova 2 COD (company-claimed)
150 MW / 2-hour Bocanova 2 in Brazoria County, TX reached commercial operation Sep 17 2026 on Tesla Megapack 2 XL systems; site total 300 MW with Bocanova 1.
Verified record
- Verified deployments
- None on file
- Active incidents
- None on file
Data & sources
Web sources
3
3 sources backing this record.View all →
Partnerships
Every company Nightpeak Energy has built with, alongside the ones only announced in a press release.
Most-frequent partners
- 1AWS1× joint30 total
Most recent
Relationships
Safety record
No incidents on record for Nightpeak Energy.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Full safety record: incidents, sourcing, and exposure data →
Nightpeak Energy on the data-center map
Every verified data center Nightpeak Energy operates that has a mapped coordinate (1 total). Filled circles are Tier-2 facilities and Tier-1 campuses under this operator; click any pin to open its record.
Nightpeak Energy data centers (1)
- Old Ocean Data CenterSweeny · 620 MW
AI data centers Nightpeak Energy operates or is a party to, from the DEPLOY data center registry.
Recent coverage
Nightpeak Energy in third-party press
Tesla batteries help Texas energy site double storage capacity to 300 megawatts
Cloudburst Data Centers secures incentives for $14B project between Austin and San Antonio
'We set the rules': Texas regulators defend $5B program for gas plants after withdrawals, denials
Partnerships
1 total
Every company Nightpeak Energy has built with, alongside the ones only announced in a press release.
Most recent
Most-frequent partners
- 1AWS1× joint30 total
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdAug 19, 2026
Added to the verified registry
Sources (3)
- https://solarbuildermag.com/projects/nightpeak-energy-doubles-battery-site-capacity-with-bocanova-2/
- https://www.prnewswire.com/news-releases/nightpeak-energy-brings-bocanova-2-online-completing-300-mw-battery-storage-project-in-ercot-302907475.html · 2026-10-13
- https://x.com/SawyerMerritt/status/2110387704810586285 · 2026-10-14
Common questions
What is Nightpeak Energy?
What does Nightpeak Energy make?
Is Nightpeak Energy publicly traded?
How can I invest in Nightpeak Energy?
Where is Nightpeak Energy headquartered?
Who owns Nightpeak Energy?
Is Nightpeak Energy a top robotics company?
Is Nightpeak Energy safe?
Methodology: Verified · 3 sources (no primary) · last reviewed 2026-10-22
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-10-22
Sources by quality tier
- 3
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Nightpeak Energy.In the press
Recent coverage mentioning Nightpeak Energy from third-party publications. Automatically surfaced; not part of the verified registry record.
Tesla batteries help Texas energy site double storage capacity to 300 megawatts
Nightpeak Energy has brought a second battery storage project near Houston into commercial operation, doubling...
Cloudburst Data Centers secures incentives for $14B project between Austin and San Antonio
'We set the rules': Texas regulators defend $5B program for gas plants after withdrawals, denials
Machine-readable surfaces
- Markdown mirror: /companies/nightpeak-energy.md
- RSS feed: /companies/nightpeak-energy/feed.xml
- JSON-LD: embedded in this page’s head
- REST API: /v1/companies/04d2065d-98e3-4db3-b201-d32e9930d095
- Revision history: /companies/nightpeak-energy/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Heat Index
Serious52/100
A composite of competitive footprint, funding, press velocity, active partnerships, and supply-chain edges. Different from the Intelligence score below (which is per-form-factor productization). Non-robotics companies cap at 25.
Reality vs attention
Not enough verified signal yet to place Nightpeak Energy against peers. Reality and attention percentiles publish once the underlying record clears its data floor.
6-month trend
Analysis
Limited public visibility and press coverage relative to peers.
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Nov 20, 2026