Data center facility
Meta Fort Worth Campus
Meta · Fort Worth. Every figure below is individually sourced and dated.
In clusterTarrant County(18)·Texas(606)
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Meta Fort Worth Campus?
Who operates Meta Fort Worth Campus?
Is Meta Fort Worth Campus operating?
How verified is the data on Meta Fort Worth Campus?
Deploy Watch
Track Meta Fort Worth Campus on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Meta Fort Worth Campus: data center facility record. Retrieved September 2, 2026, from https://registry.deploy.report/datacenters/facilities/meta-fort-worth-campus-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/meta-fort-worth-campus-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/meta-fort-worth-campus-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP