Data center campus
Nebius Independence AI Factory
Nebius Independence AI Factory is an AI data center campus developed by Nebius in Missouri. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Capacity: announced vs energized
Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2026-05-12 | claimed | press release |
| Under construction | 0.20 GW | 2026-05-12 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Nebius Independence AI Factory. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterMissouri(48)
The deal
- developer
- Nebius
- construction
- ARCO National Construction
Power
- Interconnection
County water status: Abnormally dry (D0) in Moniteau County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Nebius Independence AI Factory is in Missouri. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedunder_construction: unknown to 0.2
- Nov 2026Current: Under construction
Sources
- Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri · Nebius
- Nebius AI Factory, Independence, MO · ARCO National Construction
038574fb-7369-4285-88e1-7c63845de890 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Nebius Independence AI Factory?
How much power will Nebius Independence AI Factory use?
Who is building Nebius Independence AI Factory?
Is Nebius Independence AI Factory operating yet?
How verified is the data on Nebius Independence AI Factory?
Deploy Watch
Track Nebius Independence AI Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Nebius Independence AI Factory: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/nebius-independence-missouri-ai-factory
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-independence-missouri-ai-factory.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-independence-missouri-ai-factory
- Data documentation: /data
- Query this programmatically: Deploy MCP