Data center campus

Nebius Lappeenranta AI Factory

Nebius Lappeenranta AI Factory is an AI data center campus developed by Nebius in South Karelia, Lappeenranta. 0.31 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · Nebius · other · Lappeenranta, South Karelia, Finland (Eurosatory 2026 showcase), Europe


Capacity: announced vs energized

Announced-to-energized gap: 0.31 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2027. 15 months away. Claimed by Nebius (source).

Nebius Lappeenranta AI Factory capacity claims
Source
Announced0.31 GW2026-06-01reportedjournalist report

Key facts

announced

Lifecycle

0.31 GW

Announced

0 GW

Energized

Nebius

Developer

Europe

Location

other

Grid

0.31 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Capacity / timeline (company)
Mar 31 2026 Nebius announced a new AI factory in Lappeenranta, Finland with capacity of up to 310 MW, with first capacity expected available to customers in 2027, framed as one of Europe's largest dedicated AI factories when fully deployed (Nebius, Mar 31 2026)
Site / jobs (company)
Company describes a multi-building campus on about a 100-acre industrial site, with construction creating up to 700 skilled construction jobs (mostly local) and around 100 permanent positions once operational (Nebius, Mar 31 2026)
Cooling / heat recovery (company)
Nebius says servers will use closed-loop liquid cooling (minimal water intake) with heat recovery designed to donate excess server heat to the local district heating network, as at Mantsala (Nebius, Mar 31 2026)
Polarnode developer / Pajarila (developer)
Finnish developer Polarnode says it is jointly delivering the 310 MW campus with Nebius as operator, construction already underway in the Pajarila district, first phase expected live in 2027 (Polarnode, Mar 31 2026)
Stated investment (press)
Reuters reported the Lappeenranta project with an estimated value of more than $10 billion, with Finnish developer Polarnode already building the site and capacity due online in phases from 2027 (Reuters, Mar 31 2026)
City lease / site size (city)
City of Lappeenranta says the campus is on a 41-hectare industrial estate in Pajarila leased from the city, developed with Polarnode under a 2025 cooperation agreement, construction beginning immediately in phases (City of Lappeenranta, Mar 31 2026)

On the data center map

Every tracked data center is on this map, centered on Nebius Lappeenranta AI Factory. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Nebius Lappeenranta AI Factory
Announced capex
$10B
Jobs
100 permanent reported
Derived
Cost per MW
$32M/MW
Cost per job
$100M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

The deal

chip supplier
NVIDIA · Blackwell and Vera Rubin platforms
developer
Nebius · Amsterdam-headquartered AI cloud company (Nasdaq: NBIS), founded by Arkady Volozh; developer and operator

Power

Power source
grid
Grid operator
other
Interconnection

Why here

Nebius Lappeenranta AI Factory is in South Karelia, Lappeenranta. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Total investment ($10bn)
$10B journalist report

Investment, workforce and specs

Construction jobs
~700 skilled construction jobs source
Permanent jobs
~100 permanent positions source

Timeline

  1. Aug 2026
    party linked
    developer: linked externalName "Nebius" to company nebius
  2. Oct 2026
    Current: Announced

Sources

24031bfb-3918-454e-8ffd-c879ac2e2d63 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Nebius Lappeenranta AI Factory?
Nebius Lappeenranta AI Factory is an AI data center campus tracked on the DEPLOY registry, located in Lappeenranta. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Nebius Lappeenranta AI Factory use?
Nebius Lappeenranta AI Factory has 0.31 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Nebius Lappeenranta AI Factory?
Nebius is recorded as a party to Nebius Lappeenranta AI Factory on the DEPLOY registry. The full party list, with each role, is on the record.
Is Nebius Lappeenranta AI Factory operating yet?
As of the most recent verification on the DEPLOY registry, Nebius Lappeenranta AI Factory is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Nebius Lappeenranta AI Factory?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Nebius Lappeenranta AI Factory on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Nebius Lappeenranta AI Factory: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/nebius-lappeenranta-ai-factory

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces