Vineland campus is a tracked AI data center campus in Vineland, New Jersey, USA. Nebius's first self-built US greenfield campus

Under construction · Nebius · Vineland, New Jersey, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Vineland campus capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
300 MW (Announced 300 MW self-built New Jersey site)

On the data center map

Every tracked data center is on this map, centered on Vineland campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Nebius

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Cumberland County, week of 2026-08-18 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Vineland campus is in Vineland, New Jersey, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

5e760a5d-d058-4d1e-b46b-640945f05154 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vineland campus?
Vineland campus is an AI data center campus tracked on the DEPLOY registry, located in Vineland, New Jersey, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Vineland campus?
Nebius is recorded as a party to Vineland campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Vineland campus operating yet?
As of the most recent verification on the DEPLOY registry, Vineland campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vineland campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vineland campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vineland campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces