Data center campus
Paris (Equinix PA10)
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Equinix PA10 Saint-Denis colo (primary Nebius)
- Nebius's Sep 25 2024 blog states its first Paris data center presence is a colocation deployment at Equinix's PA10 campus in the Saint-Denis district, and that waste heat from Nebius servers will warm an urban farm on the facility roof. Frame as operator-described colo placement (Nebius, Sep 25 2024)
- H200 launch / Nebius-designed servers (primary Nebius)
- The same Nebius post says the Paris availability zone will be among the first in Europe to offer NVIDIA H200 Tensor Core GPUs, will be the first Nebius site equipped solely with Nebius-designed servers and racks from day one (no third-party servers/racks), and that NVIDIA-Certified Systems program testing covered the ML-training server design. First client workloads were planned for November 2024 (Nebius, Sep 25 2024)
- Europe AI infra investment context (reported DCD)
- Data Center Dynamics reported (Sep 26 2024) the Paris GPU cluster as part of Nebius plans to invest more than $1 billion in AI infrastructure in Europe by mid-2025, reiterated Equinix PA10 / Saint-Denis placement and Nebius-designed servers, and noted Nebius also said it would be among the first to bring NVIDIA Blackwell GPUs to customers in 2025. Frame investment and Blackwell timing as press-reported company plans (DCD, Sep 26 2024)
On the data center map
Every tracked data center is on this map, centered on Paris. Pan or zoom out to see how close rivals are building.
The deal
- developer
- Nebius
Power
- Power source
- grid
- Interconnection
Why here
Paris is in Paris. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Paris (Equinix PA10) — nebius facility
- Nebius launches its first GPU cluster in France
- Nebius deploys AI cluster at Equinix data center in Paris
c41b7fc7-1a41-42af-bfa7-cd8038b376f7 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Paris (Equinix PA10)?
Who is building Paris (Equinix PA10)?
Is Paris (Equinix PA10) operating yet?
How verified is the data on Paris (Equinix PA10)?
Deploy Watch
Track Paris (Equinix PA10) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Paris (Equinix PA10): AI data center campus record. Retrieved October 11, 2026, from https://registry.deploy.report/datacenters/nebius-paris
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-paris.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-paris
- Data documentation: /data
- Query this programmatically: Deploy MCP