Nebius Mäntsälä Data Center is an AI data center campus developed by Nebius in Uusimaa, Mäntsälä. 0.07 GW of capacity has been announced; 0.03 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Nebius · other · Mäntsälä, Uusimaa, Finland (Eurosatory 2026 showcase), Europe
Capacity: announced vs energized
Announced-to-energized gap: 0.05 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2025. Energized capacity is now on record. Claimed by Nebius (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.07 GW | 2024-10-01 | claimed | press release |
| Energized | 0.03 GW | 2024-06-01 | reported | press release |
Key facts
On the data center map
No mappable coordinate is recorded for Nebius Mäntsälä Data Center yet. Location: Mäntsälä.
The deal
- developer
- Nebius · AI cloud company (Nasdaq: NBIS); developer and operator
- chip supplier
- NVIDIA · H100/H200 and Blackwell GPUs
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
- Water
- Free cooling; heat-recovery system recovers ~20,000 MWh/yr, heating equivalent of ~2,500 Finnish homes
Why here
Nebius Mäntsälä Data Center is in Uusimaa, Mäntsälä. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- European AI infrastructure program (not Mäntsälä-specific)
- $1B. More than USD 1B across Europe by mid-2025; not site-specific company filing
Investment, workforce and specs
- Cooling
- liquid cooling with heat recovery (~20,000 MWh/yr); PUE ~1.1 source
Estimated compute: the claimed Up to 60,000 GPUs (NVIDIA H100/H200, Blackwell) chips are on the order of 6.9x the compute used to train a GPT-4-class model. Derived from the chip-count claim, not measured (basis).
Timeline
- Aug 2026financial recordedcapex: European AI infrastructure program (not Mäntsälä-specific)
- Aug 2026Current: Partially energized
Sources
- Nebius to triple capacity at Finland data center to 75 MW
- Nebius to triple capacity at Finland data center to 75 MW
dee2544a-dedc-4d29-9109-1e969a496373 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Nebius Mäntsälä Data Center?
How much power will Nebius Mäntsälä Data Center use?
Who is building Nebius Mäntsälä Data Center?
Is Nebius Mäntsälä Data Center operating yet?
How verified is the data on Nebius Mäntsälä Data Center?
Deploy Watch
Track Nebius Mäntsälä Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Nebius Mäntsälä Data Center: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/nebius-mantsala
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-mantsala.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-mantsala
- Data documentation: /data
- Query this programmatically: Deploy MCP