DEPLOYDatabase

Data center campus

Kansas City (Patmos)

Kansas City is a tracked AI data center campus in Kansas City, Kansas, USA. Colocated at Patmos data center; first US Nebius cluster (Nvidia H200)

Energized · Nebius · Kansas City, Kansas, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Kansas City (Patmos) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Nebius

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
5 MW (Public reporting: 5 MW H200 cluster at Patmos DC)

On the data center map

Every tracked data center is on this map, centered on Kansas City. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Nebius

Power

Power source
grid
Interconnection

County water status: No drought in Wyandotte County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Kansas City is in Kansas City, Kansas, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

7938825d-2c58-4241-89c3-bd9ec5ffe144 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Kansas City (Patmos)?
Kansas City (Patmos) is an AI data center campus tracked on the DEPLOY registry, located in Kansas City, Kansas, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Kansas City (Patmos)?
Nebius is recorded as a party to Kansas City (Patmos) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Kansas City (Patmos) operating yet?
As of the most recent verification on the DEPLOY registry, Kansas City (Patmos) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Kansas City (Patmos)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Kansas City (Patmos) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Kansas City (Patmos): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/nebius-kansas-city

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces