Data center campus
CyrusOne KEP OSK1 (Kansai, Japan)
Capacity: announced vs energized
Announced-to-energized gap: 0.05 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.05 GW | 2026-11-20 | claimed | press release |
Key facts
On the data center map
Every tracked data center is on this map, centered on CyrusOne KEP OSK1. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a regional-level coordinate for this campus, not a verified site coordinate, so the marker shows the regional rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Substation
- Dedicated substation with a 70 MVA utility power supply at 77KV from a new grid connection
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.048
- Nov 2026Current: Under construction
Sources
- Osaka, Japan: OSK1 · CyrusOne
- CyrusOne KEP Breaks Ground on First Data Center in Japan · CyrusOne
- CyrusOne and KEPCO top out 48MW Osaka data center · Private Wealth Daily
043b674b-b184-43d2-8279-0fc2acfff91c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is CyrusOne KEP OSK1 (Kansai, Japan)?
How much power will CyrusOne KEP OSK1 (Kansai, Japan) use?
Who is building CyrusOne KEP OSK1 (Kansai, Japan)?
Is CyrusOne KEP OSK1 (Kansai, Japan) operating yet?
How verified is the data on CyrusOne KEP OSK1 (Kansai, Japan)?
Deploy Watch
Track CyrusOne KEP OSK1 (Kansai, Japan) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). CyrusOne KEP OSK1 (Kansai, Japan): AI data center campus record. Retrieved November 23, 2026, from https://registry.deploy.report/datacenters/cyrusone-kep-osk1-kansai-japan
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/cyrusone-kep-osk1-kansai-japan.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/cyrusone-kep-osk1-kansai-japan
- Data documentation: /data
- Query this programmatically: Deploy MCP