Data center campus
Nebius Highridge Business Park AI Factory
Nebius Highridge Business Park AI Factory is an AI data center campus developed by Nebius in Pennsylvania, Butler Township (Schuylkill County). 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Nebius · Private land · PJM · Butler Township (Schuylkill County), Pennsylvania, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Expected online: October 1, 2027. 10 months away..
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2026-06-26 | claimed | company |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Operator / developer
- Nebius (fully owned and operated)
- Location
- Highridge Business Park, Butler Township, Schuylkill County, Pennsylvania
- Timeline (company-claimed)
- First phase underway; 260 MW targeted by October 2027
- Capacity (company-claimed)
- 1.2 GW at full build: 260 MW (Oct 2027), 660 MW (Jan 2029), 1,000+ MW (Nov 2029)
- Utility (company-claimed)
- PPL Electric under a dedicated energy service agreement paid for by Nebius
- Backup power (company-claimed)
- Battery storage for about 30 minutes of backup
- Site size
- About 600 acres; at least six one-story buildings reported
- Land purchase (reported)
- Closed May 1 for $187.5 million
- Transmission (reported)
- PPL rebuilding about 37 miles of line plus a new switchyard with two 230 kV lines
- Cooling (company-claimed)
- Air-cooled and closed-loop systems to minimize water use
On the data center map
Every tracked data center is on this map, centered on Nebius Highridge Business Park AI Factory. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Cooling
- air-cooled and closed-loop
- Grid
- PJM · live in ~14 months
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterPennsylvania(96)
The deal
- developer
- Nebius · Designs, builds, owns, and operates the Highridge campus.
- utility
- PPL Electric Utilities · Dedicated Energy Service Agreement and new campus-specific energy infrastructure.
- grid operator
- PJM Interconnection · Campus sits in PJM territory (company / registry gridOperator).
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
- Water
- Company: air-cooled and closed-loop systems designed to minimize water use, in compliance with Butler Township zoning; local press reported Schuylkill County Municipal Authority as the water supplier rather than a well ([Nebius](https://nebius.com/schuylkillcountypa); [Pottsville Republican Herald](https://www.republicanherald.com/2026/06/26/ai-company-starts-development-at-highridge-business-park/)).
Highridge campus BESS (backup), other, Announced. Nebius: BESS sized for approximately 30 minutes of backup/redundant power.
The PJM grid demand right now: 94.1 GW (EIA-930, 2026-11-19 16:00). Nebius Highridge Business Park AI Factory's announced 1.20 GW would be 1.3% of the grid's current load.
County water status: Abnormally dry (D0) in Schuylkill County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Nebius Highridge Business Park AI Factory sits on private land in Pennsylvania, Butler Township (Schuylkill County). It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Highridge land closing (local press)
- $188M. Pottsville Republican Herald reported Nebius closed on the land May 1 for $187.5 million; framed as reported local coverage. journalist report
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 2 permits on file with PA DEP: 1 other permit, 1 stormwater authorization.
Investment, workforce and specs
- Cooling
- air-cooled and closed-loop source
Timeline
- Nov 2026permit recordedChapter 102 individual NPDES (construction stormwater), transferred PAD540030 recorded from https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleAuth.aspx?AuthID=1570051
- Nov 2026Current: Under construction
Sources
- Highridge Business Park AI Factory · Nebius
- AI company starts development at Highridge Business Park · Pottsville Republican Herald
- Nebius details plans for 1.2GW data center campus in Pennsylvania · Data Center Dynamics
f37e6321-6224-464b-b472-70e9461bbd6d · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Nebius Highridge Business Park AI Factory?
How much power will Nebius Highridge Business Park AI Factory use?
Who is building Nebius Highridge Business Park AI Factory?
Is Nebius Highridge Business Park AI Factory operating yet?
How verified is the data on Nebius Highridge Business Park AI Factory?
Deploy Watch
Track Nebius Highridge Business Park AI Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Nebius Highridge Business Park AI Factory: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/nebius-highridge-schuylkill-pennsylvania
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-highridge-schuylkill-pennsylvania.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-highridge-schuylkill-pennsylvania
- Data documentation: /data
- Query this programmatically: Deploy MCP