Macquarie Engineering and Technology Campus

Macquarie Engineering and Technology Campus is an AI data center campus developed by Macquarie Technology Group in Macquarie Park. 0.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · Macquarie Technology Group · Macquarie Park, Australia


Capacity: announced vs energized

Announced-to-energized gap: 0.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Macquarie Engineering and Technology Campus capacity claims
Source
Announced0.20 GW2026-07-16claimedpress release

Key facts

announced

Lifecycle

0.20 GW

Announced

0 GW

Energized

Australia

Location

0.20 GW

Announced-to-energized gap

On the data center map

No mappable coordinate is recorded for Macquarie Engineering and Technology Campus yet. Location: Macquarie Park.

The deal

Why here

Macquarie Engineering and Technology Campus is in Macquarie Park. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.2
  2. Nov 2026
    Current: Announced

Sources

0491146c-6f94-440a-9ac9-41801077ad8e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is Macquarie Engineering and Technology Campus?
Macquarie Engineering and Technology Campus is an AI data center campus tracked on the DEPLOY registry, located in Macquarie Park. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Macquarie Engineering and Technology Campus use?
Macquarie Engineering and Technology Campus has 0.20 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Macquarie Engineering and Technology Campus?
Macquarie Technology Group is recorded as a party to Macquarie Engineering and Technology Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Macquarie Engineering and Technology Campus operating yet?
As of the most recent verification on the DEPLOY registry, Macquarie Engineering and Technology Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Macquarie Engineering and Technology Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Macquarie Engineering and Technology Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Macquarie Engineering and Technology Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/macquarie-engineering-and-technology-campus-macquarie-park

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces