Data center campus
Patmos Fairfield Technology Campus
Capacity: announced vs energized
Announced-to-energized gap: 0.02 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.02 GW | 2026-11-12 | claimed | press release |
Key facts
On the data center map
Every tracked data center is on this map, centered on Patmos Fairfield Technology Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a regional-level coordinate for this campus, not a verified site coordinate, so the marker shows the regional rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterAlabama(38)
The deal
- developer
- Patmos
- utility
- Alabama Power
Power
- Interconnection
County water status: Abnormally dry (D0) in Shelby County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Patmos Fairfield Technology Campus sits on owned in Alabama. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.02
- Nov 2026Current: Announced
Sources
8c438a19-42ec-4710-8712-88d59bb1d05b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Patmos Fairfield Technology Campus?
How much power will Patmos Fairfield Technology Campus use?
Who is building Patmos Fairfield Technology Campus?
Is Patmos Fairfield Technology Campus operating yet?
How verified is the data on Patmos Fairfield Technology Campus?
Deploy Watch
Track Patmos Fairfield Technology Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Patmos Fairfield Technology Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/patmos-fairfield-technology-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/patmos-fairfield-technology-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/patmos-fairfield-technology-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP