Data center campus

Red Clay Technology Center Campus

Red Clay Technology Center Campus is a tracked AI data center campus in Alabama, Lowndes. Proposed AI data center campus in Lowndes County, Alabama, readied for development by Cloverleaf Infrastructure, with Lambda as the end user. Construction is expected to begin in the first quarter of 2027 and take up to

Announced · Cloverleaf Infrastructure · Lowndes, Alabama, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Red Clay Technology Center Campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

On the data center map

Every tracked data center is on this map, centered on Red Clay Technology Center Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Red Clay Technology Center Campus
Tenant
Lambda

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterAlabama(37)

The deal

tenant
Lambda
utility
Alabama Power

Power

Interconnection

County water status: Abnormally dry (D0) in Lowndes County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Red Clay Technology Center Campus is in Alabama, Lowndes. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Community Benefits Agreement with the Central Alabama Community Foundation
$10M press release
Estimated investment in Alabama
$33.1B press release

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    financial recorded
    community_benefit: Community Benefits Agreement with the Central Alabama Community Foundation
  2. Nov 2026
    Current: Announced

Sources

4f714df9-f16c-4b97-99f8-974ff47fc48e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Red Clay Technology Center Campus?
Red Clay Technology Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Lowndes. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Red Clay Technology Center Campus?
Cloverleaf Infrastructure is recorded as a party to Red Clay Technology Center Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Red Clay Technology Center Campus operating yet?
As of the most recent verification on the DEPLOY registry, Red Clay Technology Center Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Red Clay Technology Center Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Red Clay Technology Center Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Red Clay Technology Center Campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/lambda-red-clay-technology-center-campus