Data center campus
Lambda Kansas City AI Factory
Lambda Kansas City AI Factory is an AI data center campus developed by Lambda in Missouri, Clay County. 0.02 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Lambda · Former industrial site · SPP · Kansas City, Clay County, Missouri, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.02 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 4 months away. Claimed by Lambda (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.02 GW | 2026-06-01 | reported | press release |
| Announced | 0.10 GW | 2026-06-01 | claimed | press release |
| Under construction | 0.02 GW | 2026-06-01 | verified | company filing |
Key facts
Lifecycle
Announced
Energized
Lambda
Developer
Location
Grid
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Lambda Kansas City AI Factory. Pan or zoom out to see how close rivals are building.
The deal
- developer
- Lambda · Owner and operator of the AI Factory
- operator
- Lambda
- chip supplier
- NVIDIA · Blackwell Ultra GPUs
Power
- Power source
- grid
- Grid operator
- SPP
- Interconnection
The SPP grid demand right now: 51.4 GW (EIA-930, 2026-08-19 21:00). Lambda Kansas City AI Factory's announced 0.02 GW would be 0.0% of the grid's current load.
County water status: No drought in Jackson County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Lambda Kansas City AI Factory sits on former industrial site in Missouri, Clay County. It connects to the SPP grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Announced investment
- $500M. Approximately $500 million project (more than $500M per Missouri DED) journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedchip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825
- Aug 2026Current: Under construction
Sources
ab0100f2-d003-4189-9985-4f10784191fc · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Lambda Kansas City AI Factory?
How much power will Lambda Kansas City AI Factory use?
Who is building Lambda Kansas City AI Factory?
Is Lambda Kansas City AI Factory operating yet?
How verified is the data on Lambda Kansas City AI Factory?
Deploy Watch
Track Lambda Kansas City AI Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Lambda Kansas City AI Factory: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/lambda-kansas-city-missouri
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/lambda-kansas-city-missouri.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/lambda-kansas-city-missouri
- Data documentation: /data
- Query this programmatically: Deploy MCP