Nebius Independence AI Factory Campus

Nebius Independence AI Factory Campus is an announced AI data center campus. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · SPP · Independence, Missouri, United States


Capacity: announced vs energized

Announced
1.20 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Nebius Independence AI Factory Campus capacity claims
Source
Announced1.20 GW2026-03-04reportedjournalist report

The deal

operator
Nebius Group N.V. · Ticker NBIS
utility
Independence Power & Light · Municipal utility, SPP

Power

Power source
grid
Grid operator
SPP
Interconnection

Sources

6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.