Akashi Data Center (Astana)
Akashi Data Center is an AI data center campus developed by Freedom Holding in Astana, Kazakhstan. 0.10 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Capacity: announced vs energized
Announced-to-energized gap: 0.05 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2025-06-18 | reported | journalist report |
| Energized | 0.05 GW | 2026-08-30 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Akashi Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- operator
- Freedom Holding · Freedom Holding via Freedom Telecom.
- construction
- China Mobile International · Construction partner.
- chip supplier
- NVIDIA · Program-level; sovereign AI hub.
Why here
Akashi Data Center is in Astana, Kazakhstan. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Aug 2026Current: Under construction
Sources
- About — Akashi Data Center · Akashi Data Center
- Kazakhstan to Build Central Asia's First Tier IV Data Center · The Astana Times
- Freedom Holding to Build $2B Sovereign AI Hub in Kazakhstan Powered by NVIDIA · Freedom Holding Corp
025b7841-ad1f-47b2-ac65-6ffaa31b1c1a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Akashi Data Center (Astana)?
How much power will Akashi Data Center (Astana) use?
Who is building Akashi Data Center (Astana)?
Is Akashi Data Center (Astana) operating yet?
How verified is the data on Akashi Data Center (Astana)?
Deploy Watch
Track Akashi Data Center (Astana) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Akashi Data Center (Astana): AI data center campus record. Retrieved August 31, 2026, from https://registry.deploy.report/datacenters/freedom-akashi-data-center-astana
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/freedom-akashi-data-center-astana.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/freedom-akashi-data-center-astana
- Data documentation: /data
- Query this programmatically: Deploy MCP