Data center campus
Akashi Data Center (Astana)
Akashi Data Center is an AI data center campus developed by Freedom Holding in Astana, Kazakhstan. 0.10 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Capacity: announced vs energized
Announced-to-energized gap: 0.05 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Expected online: 2027 (first phase). Energized capacity is now on record..The expected date has moved 2 times: first half of 2026, then second half of 2026, then 2027.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2025-06-18 | reported | journalist report |
| Energized | 0.05 GW | 2026-08-30 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Schedule (company-claimed)
- First phase soft launch May 2027 (earlier target was early 2026)
- Construction start (reported)
- Underway by Jun 2025
- Related AI hub (Nov 2025)
- Freedom Holding $2B sovereign AI hub with NVIDIA, 100 MW site
On the data center map
Every tracked data center is on this map, centered on Akashi Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Grid
- live in ~4 months
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- operator
- Freedom Holding · Freedom Holding via Freedom Telecom.
- construction
- China Mobile International · Construction partner.
- chip supplier
- NVIDIA · Program-level; sovereign AI hub.
Why here
Akashi Data Center is in Astana, Kazakhstan. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Nov 2026energization date changedintake proposal e37d09a3-9c33-4731-bcf6-92ce68982e99
- Nov 2026Current: Under construction
Sources
- About — Akashi Data Center · Akashi Data Center
- Kazakhstan to Build Central Asia's First Tier IV Data Center · The Astana Times
- Freedom Holding to Build $2B Sovereign AI Hub in Kazakhstan Powered by NVIDIA · Freedom Holding Corp
- В Астане строят дата-центровый кампус на $354 млн · Bizmedia.kz
025b7841-ad1f-47b2-ac65-6ffaa31b1c1a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Akashi Data Center (Astana)?
How much power will Akashi Data Center (Astana) use?
Who is building Akashi Data Center (Astana)?
Is Akashi Data Center (Astana) operating yet?
How verified is the data on Akashi Data Center (Astana)?
Deploy Watch
Track Akashi Data Center (Astana) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Akashi Data Center (Astana): AI data center campus record. Retrieved November 29, 2026, from https://registry.deploy.report/datacenters/freedom-akashi-data-center-astana
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/freedom-akashi-data-center-astana.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/freedom-akashi-data-center-astana
- Data documentation: /data
- Query this programmatically: Deploy MCP