Akashi Data Center (Astana)

Akashi Data Center is an AI data center campus developed by Freedom Holding in Astana, Kazakhstan. 0.10 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Freedom Holding · Astana, Kazakhstan


Capacity: announced vs energized

Announced-to-energized gap: 0.05 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Akashi Data Center (Astana) capacity claims
Source
Announced0.10 GW2025-06-18reportedjournalist report
Energized0.05 GW2026-08-30reportedjournalist report

Key facts

0.10 GW

Announced

0.05 GW

Energized

0.05 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Akashi Data Center. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
Freedom Holding · Freedom Holding via Freedom Telecom.
construction
China Mobile International · Construction partner.
chip supplier
NVIDIA · Program-level; sovereign AI hub.

Why here

Akashi Data Center is in Astana, Kazakhstan. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Aug 2026
    party added
    chip_supplier: NVIDIA
  2. Aug 2026
    Current: Under construction

Sources

025b7841-ad1f-47b2-ac65-6ffaa31b1c1a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is Akashi Data Center (Astana)?
Akashi Data Center (Astana) is an AI data center campus tracked on the DEPLOY registry, located in Astana, Kazakhstan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Akashi Data Center (Astana) use?
Akashi Data Center (Astana) has 0.10 GW of announced capacity on the DEPLOY registry, of which 0.05 GW is recorded as energized, an announced-to-energized gap of 0.05 GW. Each figure is individually dated and sourced.
Who is building Akashi Data Center (Astana)?
Freedom Holding is recorded as a party to Akashi Data Center (Astana) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Akashi Data Center (Astana) operating yet?
As of the most recent verification on the DEPLOY registry, Akashi Data Center (Astana) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Akashi Data Center (Astana)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Akashi Data Center (Astana) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Akashi Data Center (Astana): AI data center campus record. Retrieved August 31, 2026, from https://registry.deploy.report/datacenters/freedom-akashi-data-center-astana

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces