Data4 Athens Campus (Paiania)

Data4 Athens Campus is an AI data center campus developed by Data4 in Greece, Europe. 0.09 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Data4 · Greece, Europe


Capacity: announced vs energized

Announced-to-energized gap: 0.09 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Data4 Athens Campus (Paiania) capacity claims
Source
Announced0.09 GW2026-11-16claimedpress release

Key facts

0.09 GW

Announced

0 GW

Energized

Data4

Developer

Europe

Location

0.09 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Data4 Athens Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a regional-level coordinate for this campus, not a verified site coordinate, so the marker shows the regional rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Data4
investor
Hellenic Innovation & Infrastructure Fund

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.09
  2. Nov 2026
    Current: Partially energized

Sources

3d010f3c-e2c9-4cad-9ca9-3fe82d84a74b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is Data4 Athens Campus (Paiania)?
Data4 Athens Campus (Paiania) is an AI data center campus tracked on the DEPLOY registry, located in Greece. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Data4 Athens Campus (Paiania) use?
Data4 Athens Campus (Paiania) has 0.09 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Data4 Athens Campus (Paiania)?
Data4 is recorded as a party to Data4 Athens Campus (Paiania) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Data4 Athens Campus (Paiania) operating yet?
As of the most recent verification on the DEPLOY registry, Data4 Athens Campus (Paiania) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Data4 Athens Campus (Paiania)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Data4 Athens Campus (Paiania) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Data4 Athens Campus (Paiania): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/data4-athens-campus-paiania

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces