Data center campus
BDx CGK4 AI Data Center Park (West Java)
BDx CGK4 AI Data Center Park is an AI data center campus developed by BDx Indonesia in Jatiluhur, Purwakarta, West Java, Indonesia. 0.50 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · BDx Indonesia · PT PLN (Persero) · Jatiluhur, Purwakarta, West Java, Indonesia
Capacity: announced vs energized
Announced-to-energized gap: 0.50 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.50 GW | 2024-07-31 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
BDx Indonesia
Developer
Grid
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- 640 MW CGK4 groundbreaking / PLN power (primary)
- On Sept 22, 2026, BDx announced groundbreaking on AI Campus 2 (CGK4), a 640 MW AI data center campus in Jatiluhur, West Java, backed by 845 MVA of grid capacity from PLN, with development expected over about three years and sequential building commissioning (PR Newswire / BDx, Sept 22 2026)
- Building 1 120 MW / early 2027 (primary)
- BDx says construction has begun on Building 1, the first of six planned buildings, delivering 120 MW of IT capacity in phases, with the first contracted phase expected to enter service in early 2027. Design uses direct-to-chip liquid cooling engineered for up to 500 kW per rack (PR Newswire / BDx, Sept 22 2026)
- NVIDIA DGX-Ready / hydro pathway (primary)
- BDx states CGK4 achieved NVIDIA DGX-Ready Colocation Data Center certification in April 2025, is about five kilometers from Jatiluhur Dam, and is pursuing lower-carbon pathways including a hydroelectric arrangement with PJT alongside PLN grid power (PR Newswire / BDx, Sept 22 2026)
- Indonesia AI campus platform / financing (primary)
- BDx frames CGK4 as part of an Indonesia AI campus platform with AI Campus 1 (CGK3/3A), AI Campus 2 (CGK4), and AI Campus 3 (CGK5), citing 1.2 GVA+ secured grid capacity across AI-ready campuses and support from a US$320 million loan facility secured in 2026 (PR Newswire / BDx, Sept 22 2026)
- Six-building / 500 kW-per-rack design (primary)
- BDx's Sept 22, 2026 groundbreaking release states Building 1 is the first of six planned buildings at CGK4, delivering 120 MW of IT capacity in phases with first contracted phase expected early 2027, using direct-to-chip liquid cooling engineered for up to 500 kW per rack for current and future AI accelerators (PR Newswire / BDx, Sept 22 2026)
- West Java officials at groundbreaking (primary)
- BDx says West Java Governor Dedi Mulyadi and Purwakarta Regent Saepul Bahri Binzein attended the CGK4 groundbreaking alongside BDx and BDx Indonesia leadership, framing the campus as a long-term West Java AI ecosystem investment (PR Newswire / BDx, Sept 22 2026)
- I Squared Capital / SEZ framing (primary)
- The BDx release About section states BDx is backed by I Squared Capital, and the body notes Indonesia Special Economic Zone incentives for large-scale infrastructure investment among factors supporting campus-scale AI development with available grid capacity and domestic demand (PR Newswire / BDx, Sept 22 2026)
On the data center map
Every tracked data center is on this map, centered on BDx CGK4 AI Data Center Park. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- developer
- BDx Indonesia · Colo host/developer (BDx / Indosat / Lintasarta JV).
- operator
- Lintasarta · Runs Deka GPU / GPU Merdeka here.
- grid operator
- PT PLN (Persero) · 30 MVA PPA across CGK3A + CGK4.
- chip supplier
- NVIDIA · H100 SXM (DGX-Ready).
Why here
BDx CGK4 AI Data Center Park is in Jatiluhur, Purwakarta, West Java, Indonesia. It connects to the PT PLN (Persero) grid. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Oct 2026Current: Partially energized
Sources
- BDx Launches First Phase of 500MW Renewable-Powered AI Campus in Indonesia · BDx Data Centers
- Lintasarta Presents GPU Merdeka, powered by NVIDIA · Lintasarta
- BDx Breaks Ground on 640MW AI Data Center in West Java, Backed by 845MVA of Secured Grid Power
720c5a47-de2f-4387-bf19-da401da0655e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is BDx CGK4 AI Data Center Park (West Java)?
How much power will BDx CGK4 AI Data Center Park (West Java) use?
Who is building BDx CGK4 AI Data Center Park (West Java)?
Is BDx CGK4 AI Data Center Park (West Java) operating yet?
How verified is the data on BDx CGK4 AI Data Center Park (West Java)?
Deploy Watch
Track BDx CGK4 AI Data Center Park (West Java) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). BDx CGK4 AI Data Center Park (West Java): AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/bdx-cgk4-ai-data-center-park
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/bdx-cgk4-ai-data-center-park.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/bdx-cgk4-ai-data-center-park
- Data documentation: /data
- Query this programmatically: Deploy MCP