DEPLOYDatabase

Data center campus

BDx CGK2 TechnoPark BSD

BDx CGK2 TechnoPark BSD is a tracked AI data center campus in BSD (Tangerang).

Energized · BDx Data Centers · BSD (Tangerang), Indonesia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
BDx CGK2 TechnoPark BSD capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Indonesia

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
3.5 MW (3.5 MW total capacity operational)

On the data center map

No mappable coordinate is recorded for BDx CGK2 TechnoPark BSD yet. Location: BSD (Tangerang).

The deal

Power

Power source
grid
Interconnection

Why here

BDx CGK2 TechnoPark BSD is in BSD (Tangerang). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

68cfd32e-faf7-499a-a45c-0892ac260200 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is BDx CGK2 TechnoPark BSD?
BDx CGK2 TechnoPark BSD is an AI data center campus tracked on the DEPLOY registry, located in BSD (Tangerang). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building BDx CGK2 TechnoPark BSD?
BDx Data Centers is recorded as a party to BDx CGK2 TechnoPark BSD on the DEPLOY registry. The full party list, with each role, is on the record.
Is BDx CGK2 TechnoPark BSD operating yet?
As of the most recent verification on the DEPLOY registry, BDx CGK2 TechnoPark BSD is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on BDx CGK2 TechnoPark BSD?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track BDx CGK2 TechnoPark BSD on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). BDx CGK2 TechnoPark BSD: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/bdx-data-centers-bdx-cgk2-technopark-bsd

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces