Data center campus

EdgeConneX Cedar Creek Campus (CoreWeave AUS02)

EdgeConneX Cedar Creek Campus is an AI data center campus developed by EdgeConneX in Texas, Bastrop. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · EdgeConneX · Private land · ERCOT · Cedar Creek, Bastrop, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Expected online: August 1, 2026. 4 months past the claimed date, with no energized capacity on record..

EdgeConneX Cedar Creek Campus (CoreWeave AUS02) capacity claims
Source
Announced0.10 GW2025-04-01claimedcompany

Key facts

0.10 GW

Announced

0 GW

Energized

EdgeConneX

Developer

ERCOT

Grid

0.10 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Developer / landlord
EdgeConneX
Named occupant (Building 1)
CoreWeave
Location
6752 FM 535, Cedar Creek, Bastrop County, Texas
Timeline (sources differ)
First building to open Aug 2026 per local press; first phase by 2027 per EdgeConneX
Power phasing (company-claimed)
AUS01 96 MW first building on 130 acres; Austin sites total 240 MW
Building 1 cost (reported)
About $440 million
Tax treatment
Bastrop County 10-year 75% abatement (Dec 2024), assigned to CoreWeave Oct 2025
Campus scope (reported)
Up to 19 potential buildings across Cedar Creek sites; Wolf Lane campus planned for four
Building naming (sources differ)
EdgeConneX calls the site AUS01; press calls the CoreWeave building AUS02

On the data center map

Every tracked data center is on this map, centered on EdgeConneX Cedar Creek Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of EdgeConneX Cedar Creek Campus (CoreWeave AUS02)
Announced capex
$440M
Cooling
closed-loop (local reporting for Cedar Creek EdgeConneX facilities)
Grid
ERCOT · due 2026
Tenant
CoreWeave
Derived
Cost per MW
$5M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterBastrop(7)·Texas(611)

The deal

developer
EdgeConneX · Campus developer / landlord for the Cedar Creek multi-building project.
tenant
CoreWeave · Named qualifying occupant of Building 1 in Texas/county records per Community Impact.
grid operator
ERCOT · Campus sits in the ERCOT footprint (registry gridOperator).

Power

Power source
grid
Grid operator
ERCOT
Interconnection
Water
Local reporting says Cedar Creek EdgeConneX facilities are expected to use closed-loop cooling designed to reduce water consumption ([Texas Reporter](https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/)).

The Texas (ERCOT) grid demand right now: 50.6 GW (EIA-930, 2026-11-07 05:00). EdgeConneX Cedar Creek Campus's announced 0.10 GW would be 0.2% of the grid's current load.

County water status: Severe drought (D2) in Bastrop County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

EdgeConneX Cedar Creek Campus sits on private land in Texas, Bastrop. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Building 1 estimated project cost (reported)
$440M. Community Impact / DCD: ~$440M estimated cost for the first Cedar Creek building associated with CoreWeave occupancy. journalist report

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

Investment, workforce and specs

Capex
$440M source
Cooling
closed-loop (local reporting for Cedar Creek EdgeConneX facilities) source

Timeline

  1. Sep 2026
    party added
    grid_operator: ERCOT
  2. Nov 2026
    Current: Under construction

Sources

e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is an AI data center campus tracked on the DEPLOY registry, located in Cedar Creek. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will EdgeConneX Cedar Creek Campus (CoreWeave AUS02) use?
EdgeConneX Cedar Creek Campus (CoreWeave AUS02) has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
EdgeConneX is recorded as a party to EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on the DEPLOY registry. The full party list, with each role, is on the record.
Is EdgeConneX Cedar Creek Campus (CoreWeave AUS02) operating yet?
As of the most recent verification on the DEPLOY registry, EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). EdgeConneX Cedar Creek Campus (CoreWeave AUS02): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/edgeconnex-cedar-creek-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces