Data center campus
EdgeConneX Cedar Creek Campus (CoreWeave AUS02)
EdgeConneX Cedar Creek Campus is an AI data center campus developed by EdgeConneX in Texas, Bastrop. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · EdgeConneX · Private land · ERCOT · Cedar Creek, Bastrop, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2025-04-01 | claimed | company |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Developer / landlord
- EdgeConneX (EdgeConneX; Community Impact)
- Named occupant (Building 1)
- CoreWeave (Texas records / county abatement assignment) (Community Impact; Data Center Dynamics)
- Location / address
- Cedar Creek, Bastrop County, Texas; EdgeConneX publishes AUS01 at 6752 FM 535, Cedar Creek, TX 78612 (Wolf Lane area) (EdgeConneX; Community Impact)
- Lifecycle / timeline
- Under construction; Community Impact (Jul 2026) reported first building expected to open August 2026; EdgeConneX datasheet framed AUS01 first phase planned to arrive by 2027 (Community Impact; EdgeConneX Austin Data Sheet)
- Published power phasing (EdgeConneX Austin)
- AUS01: 96 MW first building on a 130-acre master-planned site (datasheet also cites 336 MW initial potential); AUS02-04: further phases including one 48 MW and two 96 MW buildings; combined Austin sites listed at 240 MW (EdgeConneX; EdgeConneX Austin Data Sheet)
- Building 1 project cost (reported)
- $440 million estimated cost; DCD cited ~578,000 sq ft two-story AUS02 building in TDLR context (Community Impact; Data Center Dynamics)
- Tax treatment (Building 1)
- Bastrop County 10-year 75% property tax abatement approved Dec 2024 and assigned to CoreWeave Oct 2025; Texas Comptroller certified qualifying large data center project Jul 11, 2025 (20-year sales/use tax exemption on qualifying purchases) (Community Impact)
- Campus scope notes
- Community Impact described the first of up to 19 potential EdgeConneX buildings across Cedar Creek sites; DCD reported the Wolf Lane campus planned for four buildings once completed. A separate EdgeConneX campus at 6682 FM 535 (EDCAUS11-14) carries ~$2.8B combined estimated construction cost in TDLR filings per Texas Reporter and is distinct from this Wolf Lane row (Community Impact; Data Center Dynamics; Texas Reporter)
- Naming note (AUS01 vs AUS02)
- EdgeConneX materials label the 6752 FM 535 site AUS01 (96 MW first building). Community Impact / DCD describe CoreWeave as Building 1 / AUS02 occupant at the same Cedar Creek / Wolf Lane campus. Treat AUS labels carefully until primary materials align the building ID with the CoreWeave lease (EdgeConneX; Community Impact; Data Center Dynamics)
On the data center map
Every tracked data center is on this map, centered on EdgeConneX Cedar Creek Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $440M
- Cooling
- closed-loop (local reporting for Cedar Creek EdgeConneX facilities)
- Grid
- ERCOT · due 2026
- Tenant
- CoreWeave
- Cost per MW
- $5M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterBastrop(7)·Texas(606)
The deal
- developer
- EdgeConneX · Campus developer / landlord for the Cedar Creek multi-building project.
- tenant
- CoreWeave · Named qualifying occupant of Building 1 in Texas/county records per Community Impact.
- grid operator
- ERCOT · Campus sits in the ERCOT footprint (registry gridOperator).
Power
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
- Water
- Local reporting says Cedar Creek EdgeConneX facilities are expected to use closed-loop cooling designed to reduce water consumption ([Texas Reporter](https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/)).
The Texas (ERCOT) grid demand right now: 67.4 GW (EIA-930, 2026-09-28 04:00). EdgeConneX Cedar Creek Campus's announced 0.10 GW would be 0.1% of the grid's current load.
County water status: Extreme drought (D3) in Bastrop County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
EdgeConneX Cedar Creek Campus sits on private land in Texas, Bastrop. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Building 1 estimated project cost (reported)
- $440M. Community Impact / DCD: ~$440M estimated cost for the first Cedar Creek building associated with CoreWeave occupancy. journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Sep 2026party addedgrid_operator: ERCOT
- Sep 2026Current: Under construction
Sources
- AI cloud company CoreWeave to fill $440M Cedar Creek data center · Community Impact
- EdgeConneX Austin Data Center | Colocation & Connectivity · EdgeConneX
- EdgeConneX Austin Data Sheet (April 2025) · EdgeConneX
- CoreWeave to lease capacity from EdgeConneX at data center campus in Cedar Creek, Texas · Data Center Dynamics
- Four Cedar Creek data centers represent $2.8 billion development · Texas Reporter
e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
How much power will EdgeConneX Cedar Creek Campus (CoreWeave AUS02) use?
Who is building EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
Is EdgeConneX Cedar Creek Campus (CoreWeave AUS02) operating yet?
How verified is the data on EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
Deploy Watch
Track EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). EdgeConneX Cedar Creek Campus (CoreWeave AUS02): AI data center campus record. Retrieved September 28, 2026, from https://registry.deploy.report/datacenters/edgeconnex-cedar-creek-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/edgeconnex-cedar-creek-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/edgeconnex-cedar-creek-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP