EdgeConneX Cedar Creek Campus (CoreWeave AUS02)

EdgeConneX Cedar Creek Campus is an AI data center campus developed by EdgeConneX in Texas, Bastrop. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · EdgeConneX · Private land · ERCOT · Cedar Creek, Bastrop, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

EdgeConneX Cedar Creek Campus (CoreWeave AUS02) capacity claims
Source
Announced0.10 GW2025-04-01claimedcompany

Key facts

0.10 GW

Announced

0 GW

Energized

EdgeConneX

Developer

ERCOT

Grid

0.10 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Developer / landlord
EdgeConneX (EdgeConneX; Community Impact)
Named occupant (Building 1)
CoreWeave (Texas records / county abatement assignment) (Community Impact; Data Center Dynamics)
Location / address
Cedar Creek, Bastrop County, Texas; EdgeConneX publishes AUS01 at 6752 FM 535, Cedar Creek, TX 78612 (Wolf Lane area) (EdgeConneX; Community Impact)
Lifecycle / timeline
Under construction; Community Impact (Jul 2026) reported first building expected to open August 2026; EdgeConneX datasheet framed AUS01 first phase planned to arrive by 2027 (Community Impact; EdgeConneX Austin Data Sheet)
Published power phasing (EdgeConneX Austin)
AUS01: 96 MW first building on a 130-acre master-planned site (datasheet also cites 336 MW initial potential); AUS02-04: further phases including one 48 MW and two 96 MW buildings; combined Austin sites listed at 240 MW (EdgeConneX; EdgeConneX Austin Data Sheet)
Building 1 project cost (reported)
$440 million estimated cost; DCD cited ~578,000 sq ft two-story AUS02 building in TDLR context (Community Impact; Data Center Dynamics)
Tax treatment (Building 1)
Bastrop County 10-year 75% property tax abatement approved Dec 2024 and assigned to CoreWeave Oct 2025; Texas Comptroller certified qualifying large data center project Jul 11, 2025 (20-year sales/use tax exemption on qualifying purchases) (Community Impact)
Campus scope notes
Community Impact described the first of up to 19 potential EdgeConneX buildings across Cedar Creek sites; DCD reported the Wolf Lane campus planned for four buildings once completed. A separate EdgeConneX campus at 6682 FM 535 (EDCAUS11-14) carries ~$2.8B combined estimated construction cost in TDLR filings per Texas Reporter and is distinct from this Wolf Lane row (Community Impact; Data Center Dynamics; Texas Reporter)
Naming note (AUS01 vs AUS02)
EdgeConneX materials label the 6752 FM 535 site AUS01 (96 MW first building). Community Impact / DCD describe CoreWeave as Building 1 / AUS02 occupant at the same Cedar Creek / Wolf Lane campus. Treat AUS labels carefully until primary materials align the building ID with the CoreWeave lease (EdgeConneX; Community Impact; Data Center Dynamics)

On the data center map

Every tracked data center is on this map, centered on EdgeConneX Cedar Creek Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of EdgeConneX Cedar Creek Campus (CoreWeave AUS02)
Announced capex
$440M
Cooling
closed-loop (local reporting for Cedar Creek EdgeConneX facilities)
Grid
ERCOT · due 2026
Tenant
CoreWeave
Derived
Cost per MW
$5M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterBastrop(7)·Texas(606)

The deal

developer
EdgeConneX · Campus developer / landlord for the Cedar Creek multi-building project.
tenant
CoreWeave · Named qualifying occupant of Building 1 in Texas/county records per Community Impact.
grid operator
ERCOT · Campus sits in the ERCOT footprint (registry gridOperator).

Power

Power source
grid
Grid operator
ERCOT
Interconnection
Water
Local reporting says Cedar Creek EdgeConneX facilities are expected to use closed-loop cooling designed to reduce water consumption ([Texas Reporter](https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/)).

The Texas (ERCOT) grid demand right now: 67.4 GW (EIA-930, 2026-09-28 04:00). EdgeConneX Cedar Creek Campus's announced 0.10 GW would be 0.1% of the grid's current load.

County water status: Extreme drought (D3) in Bastrop County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

EdgeConneX Cedar Creek Campus sits on private land in Texas, Bastrop. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Building 1 estimated project cost (reported)
$440M. Community Impact / DCD: ~$440M estimated cost for the first Cedar Creek building associated with CoreWeave occupancy. journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Investment, workforce and specs

Capex
$440M source
Cooling
closed-loop (local reporting for Cedar Creek EdgeConneX facilities) source

Timeline

  1. Sep 2026
    party added
    grid_operator: ERCOT
  2. Sep 2026
    Current: Under construction

Sources

e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is an AI data center campus tracked on the DEPLOY registry, located in Cedar Creek. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will EdgeConneX Cedar Creek Campus (CoreWeave AUS02) use?
EdgeConneX Cedar Creek Campus (CoreWeave AUS02) has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
EdgeConneX is recorded as a party to EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on the DEPLOY registry. The full party list, with each role, is on the record.
Is EdgeConneX Cedar Creek Campus (CoreWeave AUS02) operating yet?
As of the most recent verification on the DEPLOY registry, EdgeConneX Cedar Creek Campus (CoreWeave AUS02) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on EdgeConneX Cedar Creek Campus (CoreWeave AUS02)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track EdgeConneX Cedar Creek Campus (CoreWeave AUS02) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). EdgeConneX Cedar Creek Campus (CoreWeave AUS02): AI data center campus record. Retrieved September 28, 2026, from https://registry.deploy.report/datacenters/edgeconnex-cedar-creek-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces