Data center campus
Ooredoo / Syntys AI Cloud (Qatar)
Ooredoo / Syntys AI Cloud is a tracked AI data center campus in Doha, Qatar. Ooredoo's sovereign GPU-as-a-service in Qatar, hosted in data centers operated by Syntys (spun out of Ooredoo in 2025; Iron Mountain an investor) on NVIDIA Hopper GPUs. AI cloud launched July 2025; ~26 MW total live IT i
Partially energized · Syntys · Doha, Qatar
Capacity: announced vs energized
| Source | ||||
|---|---|---|---|---|
| Energized | 0.03 GW | 2026-01-01 | reported | journalist report |
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Sovereign AI cloud (company-claimed, Jul 2025)
- Ooredoo's sovereign AI cloud on NVIDIA Hopper GPUs, hosted in Syntys-operated data centers in Qatar.
- Facility design (company-claimed)
- Existing sites converted with modular GPU-ready design, advanced cooling and high-density racks.
- NVIDIA Cloud Partner (company-claimed)
- Ooredoo offers GPUs and NVIDIA AI Enterprise to energy, finance, logistics, health and smart-city users.
- Iron Mountain stake
- Iron Mountain took a minority stake in Syntys (formerly MENA Digital Hub) in 2025.
- Policy framing (company-claimed)
- Supports Qatar Digital Agenda 2030 and the National AI Strategy with local data residency.
On the data center map
Every tracked data center is on this map, centered on Ooredoo / Syntys AI Cloud. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- operator
- Ooredoo · Ooredoo's sovereign AI cloud.
- developer
- Syntys · Operates the Qatar DC infrastructure.
- chip supplier
- NVIDIA · Hopper GPUs; model not published.
Why here
Ooredoo / Syntys AI Cloud is in Doha, Qatar. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Nov 2026Current: Partially energized
Sources
- Ooredoo launches AI cloud in Qatar using Nvidia tech · RCR Wireless
- Syntys Powers Ooredoo's Sovereign AI Cloud in Qatar · Syntys
- Syntys Delivers Mission-Critical Infrastructure for Ooredoo's advanced sovereign AI cloud services
- Ooredoo Deploys NVIDIA Accelerated Computing in Qatar
- Syntys Joint Venture | Data Centers in Qatar & MENA Region
8e9fcdea-e1c9-4a53-bfca-42ea935d45bb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Ooredoo / Syntys AI Cloud (Qatar)?
Who is building Ooredoo / Syntys AI Cloud (Qatar)?
Is Ooredoo / Syntys AI Cloud (Qatar) operating yet?
How verified is the data on Ooredoo / Syntys AI Cloud (Qatar)?
Deploy Watch
Track Ooredoo / Syntys AI Cloud (Qatar) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Ooredoo / Syntys AI Cloud (Qatar): AI data center campus record. Retrieved November 3, 2026, from https://registry.deploy.report/datacenters/ooredoo-syntys-ai-cloud-qatar
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/ooredoo-syntys-ai-cloud-qatar.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/ooredoo-syntys-ai-cloud-qatar
- Data documentation: /data
- Query this programmatically: Deploy MCP