DEPLOYDatabase

Data center campus

STTGDC NOI2

STTGDC NOI2 is a tracked AI data center campus in Noida, Uttar Pradesh, India. Colocation data centre on the STTGDC Noida campus, inaugurated in November 2026 with 22 MW of critical IT load. Indian AI cloud company Neysa selected it to host a GPU deployment whose first phase supports up to 9,000 GP

Energized · ST Telemedia Global Data Centres · Noida, Uttar Pradesh, India, India


Capacity: announced vs energized

STTGDC NOI2 capacity claims
Source
Energized0.02 GW2026-11-03claimedpress release

Key facts

On the data center map

Every tracked data center is on this map, centered on STTGDC NOI2. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of STTGDC NOI2
Tenant
Neysa

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

The deal

tenant
Neysa

Why here

STTGDC NOI2 is in Noida, Uttar Pradesh, India. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

Timeline

  1. Nov 2026
    capacity changed
    energized: unknown to 0.022
  2. Nov 2026
    Current: Energized

Sources

b22c7d85-9f15-4787-8414-55aa9f465089 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is STTGDC NOI2?
STTGDC NOI2 is an AI data center campus tracked on the DEPLOY registry, located in Noida, Uttar Pradesh, India. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building STTGDC NOI2?
ST Telemedia Global Data Centres is recorded as a party to STTGDC NOI2 on the DEPLOY registry. The full party list, with each role, is on the record.
Is STTGDC NOI2 operating yet?
As of the most recent verification on the DEPLOY registry, STTGDC NOI2 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on STTGDC NOI2?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track STTGDC NOI2 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). STTGDC NOI2: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/sttgdc-noi2-noida

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces