Data center campus
STTGDC NOI2
STTGDC NOI2 is a tracked AI data center campus in Noida, Uttar Pradesh, India. Colocation data centre on the STTGDC Noida campus, inaugurated in November 2026 with 22 MW of critical IT load. Indian AI cloud company Neysa selected it to host a GPU deployment whose first phase supports up to 9,000 GP
Energized · ST Telemedia Global Data Centres · Noida, Uttar Pradesh, India, India
Capacity: announced vs energized
| Source | ||||
|---|---|---|---|---|
| Energized | 0.02 GW | 2026-11-03 | claimed | press release |
Key facts
On the data center map
Every tracked data center is on this map, centered on STTGDC NOI2. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Tenant
- Neysa
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- operator
- ST Telemedia Global Data Centres
- tenant
- Neysa
Why here
STTGDC NOI2 is in Noida, Uttar Pradesh, India. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedenergized: unknown to 0.022
- Nov 2026Current: Energized
Sources
- STTGDC India Inaugurates 22 MW Data Centre in Noida as Part of Approximately 200 MW planned across Delhi NCR · STTGDC
- STTGDC to host Neysa’s AI Compute Infrastructure at Noida Data Centre · STTGDC
b22c7d85-9f15-4787-8414-55aa9f465089 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is STTGDC NOI2?
Who is building STTGDC NOI2?
Is STTGDC NOI2 operating yet?
How verified is the data on STTGDC NOI2?
Deploy Watch
Track STTGDC NOI2 on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). STTGDC NOI2: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/sttgdc-noi2-noida
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/sttgdc-noi2-noida.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/sttgdc-noi2-noida
- Data documentation: /data
- Query this programmatically: Deploy MCP