Data center campus
RackBank GigaCampus (Indore)
RackBank GigaCampus is an AI data center campus developed by RackBank Datacenters in Pithampur, Indore, Madhya Pradesh, India. 0.08 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · RackBank Datacenters · Pithampur, Indore, Madhya Pradesh, India
Capacity: announced vs energized
Announced-to-energized gap: 0.08 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.08 GW | 2024-10-24 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
RackBank Datacenters
Developer
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on RackBank GigaCampus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- developer
- RackBank Datacenters · Develops/operates the GigaCampus.
- operator
- NeevCloud · NeevCloud AI SuperCloud (same leadership as RackBank).
- chip supplier
- NVIDIA · Blackwell-ready; H200/B200/B300 marketed.
Why here
RackBank GigaCampus is in Pithampur, Indore, Madhya Pradesh, India. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Aug 2026Current: Under construction
Sources
- Foundation Stone for India's First Purpose-Built AI Data Center in Madhya Pradesh · PR Newswire
- RackBank: Indore Data Center · Baxtel
98aff169-e1ee-4c4c-8249-1c15ae228b25 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is RackBank GigaCampus (Indore)?
How much power will RackBank GigaCampus (Indore) use?
Who is building RackBank GigaCampus (Indore)?
Is RackBank GigaCampus (Indore) operating yet?
How verified is the data on RackBank GigaCampus (Indore)?
Deploy Watch
Track RackBank GigaCampus (Indore) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). RackBank GigaCampus (Indore): AI data center campus record. Retrieved August 31, 2026, from https://registry.deploy.report/datacenters/rackbank-gigacampus-indore
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/rackbank-gigacampus-indore.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/rackbank-gigacampus-indore
- Data documentation: /data
- Query this programmatically: Deploy MCP