Kraft Group Sutton Data Center Campus is an AI data center campus developed by The Kraft Group in Massachusetts, Sutton. 0.90 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · The Kraft Group · Sutton, Massachusetts, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.90 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Kraft Group Sutton Data Center Campus capacity claims
Source
Announced0.90 GW2026-11-10reportedjournalist report

Key facts

announced

Lifecycle

0.90 GW

Announced

0 GW

Energized

The Kraft Group

Developer

0.90 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Kraft Group Sutton Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterMassachusetts(42)

The deal

developer
The Kraft Group
developer
Unified Global Packaging Group

Power

Interconnection

County water status: Abnormally dry (D0) in Sutton County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Kraft Group Sutton Data Center Campus is in Massachusetts, Sutton. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.9
  2. Nov 2026
    Current: Announced

Sources

b34aa5e9-cd0d-4c3d-881c-76cf4dfc4a0e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Kraft Group Sutton Data Center Campus?
Kraft Group Sutton Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Sutton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Kraft Group Sutton Data Center Campus use?
Kraft Group Sutton Data Center Campus has 0.90 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Kraft Group Sutton Data Center Campus?
The Kraft Group is recorded as a party to Kraft Group Sutton Data Center Campus on the DEPLOY registry.
Is Kraft Group Sutton Data Center Campus operating yet?
As of the most recent verification on the DEPLOY registry, Kraft Group Sutton Data Center Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Kraft Group Sutton Data Center Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Kraft Group Sutton Data Center Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Kraft Group Sutton Data Center Campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/kraft-group-sutton-data-center-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces