Kurnool Green Compute Factory is an AI data center campus developed by Neysa in Kurnool district, Andhra Pradesh. 2 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Capacity: announced vs energized
Announced-to-energized gap: 2 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 2 GW | 2026-11-13 | claimed | journalist report |
Key facts
On the data center map
Every tracked data center is on this map, centered on Kurnool Green Compute Factory. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Tenant
- Neysa
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- tenant
- Neysa
- power developer
- CleanMax
Why here
Kurnool Green Compute Factory is in Kurnool district, Andhra Pradesh. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Nov 2026capacity changedannounced: unknown to 2
- Nov 2026Current: Announced
Sources
- CleanMax, Neysa Plan 2 GW AI Compute Factory in Andhra Pradesh · Elets CIO
- CleanMax to invest Rs 50,000 crore in Andhra Pradesh green energy complex to power 2 GW AI factory · Moneycontrol
70013ea5-04dc-4b60-915f-eb842b6d09f3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Kurnool Green Compute Factory?
How much power will Kurnool Green Compute Factory use?
Who is building Kurnool Green Compute Factory?
Is Kurnool Green Compute Factory operating yet?
How verified is the data on Kurnool Green Compute Factory?
Deploy Watch
Track Kurnool Green Compute Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Kurnool Green Compute Factory: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/cleanmax-neysa-kurnool-green-compute-factory
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/cleanmax-neysa-kurnool-green-compute-factory.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/cleanmax-neysa-kurnool-green-compute-factory
- Data documentation: /data
- Query this programmatically: Deploy MCP