5C Mount Carmel Township data center campus is an AI data center campus developed by 5C Data Centers in Pennsylvania. 0.16 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · 5C Data Centers · Former industrial site · Pennsylvania, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.16 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.16 GW | 2026-11-20 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on 5C Mount Carmel Township data center campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Tenant
- AMD
- Land owner
- Fit Energy USA
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterPennsylvania(97)
The deal
- operator
- 5C Data Centers
- tenant
- AMD
- land owner
- Fit Energy USA
Power
- Interconnection
County water status: Abnormally dry (D0) in Lycoming County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
5C Mount Carmel Township data center campus sits on former industrial site in Pennsylvania. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.16
- Nov 2026Current: Announced
Sources
- AMD named tenant in Mount Carmel Township data center project with potential 2,400-acre campus · The News-Item
- Pennsylvania filing names AMD as Project Phoenix tenant · Data Phoenix
- AMD named intended tenant at planned 5C Pennsylvania data campus · Private Wealth Daily
d3473917-8d06-4873-9049-d953c9440389 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)?
How much power will 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania) use?
Who is building 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)?
Is 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania) operating yet?
How verified is the data on 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)?
Deploy Watch
Track 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). 5C Mount Carmel Township data center campus (Northumberland County, Pennsylvania): AI data center campus record. Retrieved November 23, 2026, from https://registry.deploy.report/datacenters/5c-amd-mount-carmel-township-data-center-campus-pennsylvania
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/5c-amd-mount-carmel-township-data-center-campus-pennsylvania.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/5c-amd-mount-carmel-township-data-center-campus-pennsylvania
- Data documentation: /data
- Query this programmatically: Deploy MCP