Revision history
Ascento revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Company
Recorded posture
- First recorded event: 2026-06-27
- Last material change: 2026-06-27
Material events (1)
- 2026-06-27: verification_state_change on reviewStatus unreviewed -> reviewed (source: https://www.ascento.ai/) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date. To restate a recorded change, write a new event through the updateEntityField chokepoint.
Machine-readable: /companies/ascento/history.md + REST /v1/companies/49b0d25c-afd5-4df8-8d2b-656e091e9849/history.