Revision history
Diakont revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Company
Recorded posture
- First recorded event: 2026-06-27
- Last material change: 2026-06-27
Material events (1)
- 2026-06-27: verification_state_change on reviewStatus unreviewed -> reviewed (source: https://diakont.com/case-studies/energy-services/crawler-type-robotic-in-line-inspection-of-pipelines-and-facility-piping/) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date. To restate a recorded change, write a new event through the updateEntityField chokepoint.
Machine-readable: /companies/diakont/history.md + REST /v1/companies/983940b8-1a1f-47ee-99b6-eb6dad618d11/history.