Revision history
Loram revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Company
Recorded posture
- First recorded event: 2026-06-27
- Last material change: 2026-06-27
Material events (1)
- 2026-06-27: verification_state_change on reviewStatus unreviewed -> reviewed (source: https://loram.com/inspection-and-optimization/inspection-services/rail-inspection/) (verified)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date. To restate a recorded change, write a new event through the updateEntityField chokepoint.
Machine-readable: /companies/loram/history.md + REST /v1/companies/bffb96c6-ba02-4f7e-9547-0c89390fd76d/history.