Data center comparison
Equinix AB1 Abidjan vs Equinix Sagamu Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Equinix AB1 Abidjan | Equinix Sagamu Campus | |
|---|---|---|
| Announced capacity | not recorded | not recorded |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | not recorded | not recorded |
| Lifecycle | energized | announced |
| Developer | MainOne | MainOne |
| Location | Abidjan, Côte d'Ivoire | Sagamu, Nigeria |
| Grid | not recorded | not recorded |
| Acreage | not recorded | not recorded |
Common questions
Which is further along, Equinix AB1 Abidjan or Equinix Sagamu Campus?
Equinix AB1 Abidjan is energized; Equinix Sagamu Campus is announced. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Equinix AB1 Abidjan and Equinix Sagamu Campus?
Equinix AB1 Abidjan is in Abidjan, Côte d'Ivoire; Equinix Sagamu Campus is in Sagamu, Nigeria. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.