DEPLOYDatabase

Deployment

STT VNG Ho Chi Minh City 2 at Ho Chi Minh City

STT VNG Ho Chi Minh City 2 is an other robot built by ST Telemedia Global Data Centres.

· Unverified


STT VNG HCMC 2, up to 60MW IT load capacity. Expected operational H1 2026. 1.5km from HCMC 1.

Exposure

Customer segment
consumer
Scale tier
commercial 10 99

Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.

Safety record

No incidents on record for STT VNG Ho Chi Minh City 2 at Ho Chi Minh City.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Unverifiedhow tiers work →
Last updated
2026-08-27
Status
announced
Operator type
maker operated
First seen
2024-05-15
ID
8bac8f7e-8f58-4280-9d7a-9c8b9cc3b729

Timeline

  1. May 2024
    First recorded
    STT VNG Ho Chi Minh City 2 first documented operating at Ho Chi Minh City.
  2. Aug 2026
    Current status: announced
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

STT VNG Ho Chi Minh City 2 is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

STT VNG Ho Chi Minh City 2 operates in Ho Chi Minh City. Explore the full verified map:

Sources (1)

  1. https://www.sttelemediagdc.com/newsroom/stt-gdc-expands-vietnam-through-joint-venture-vng-build-and-operate-data-centres
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-27

Verification posture

Unreviewed

Low confidence

Review state

Stable

Last reviewed 2026-08-27

Maturity + lifecycle

Maturity stage: pilot

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for STT VNG Ho Chi Minh City 2 at Ho Chi Minh City.

Common questions

What is the STT VNG Ho Chi Minh City 2 deployment at Ho Chi Minh City?
STT VNG Ho Chi Minh City 2, built by ST Telemedia Global Data Centres, is recorded as a deployment at Ho Chi Minh City on the DEPLOY registry. ST Telemedia Global Data Centres operates the deployment directly.
Who operates STT VNG Ho Chi Minh City 2 at Ho Chi Minh City?
ST Telemedia Global Data Centres, the manufacturer of STT VNG Ho Chi Minh City 2, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the STT VNG Ho Chi Minh City 2 deployment at Ho Chi Minh City go live?
The deployment is recorded as starting May 15, 2024 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Is the STT VNG Ho Chi Minh City 2 deployment at Ho Chi Minh City still active?
As of the most recent verification on the DEPLOY registry, this deployment is announced but not yet operating.
Have there been incidents at the STT VNG Ho Chi Minh City 2 deployment at Ho Chi Minh City?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces