Revision history
Cellula Robotics x BAE Systems (Herne XLAUV) revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2025-09-01
- Last material change: 2025-09-01
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/cellula-robotics-x-bae-systems-herne-xlauv/history.md + REST /v1/partnerships/c0ddea43-cc04-4273-8451-314fdd7a8003/history.