Revision history
CRCC x MCB (DRC Solar Infrastructure MOU) revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-08-22
- Last material change: 2026-08-22
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/crcc-x-mcb-drc-solar-infrastructure-mou/history.md + REST /v1/partnerships/29746218-6ccf-46ca-b192-2aff2246730b/history.