DEPLOYDatabase

Revision history

Delta Electronics x LINAK (D-Bot Cobot Ecosystem) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Delta Electronics x LINAK (D-Bot Cobot Ecosystem)

Recorded posture

  • First recorded event: 2025-08-15
  • Last material change: 2025-08-15

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/delta-electronics-x-linak-d-bot-cobot-ecosystem/history.md + REST /v1/partnerships/13f896d6-f2d2-466d-9e0a-58be232cd175/history.