DEPLOYDatabase

Revision history

ECP x KKR (50B Data Center Power Partnership) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to ECP x KKR (50B Data Center Power Partnership)

Recorded posture

  • First recorded event: 2024-10-31
  • Last material change: 2024-10-31

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/ecp-x-kkr-50b-data-center-power-partnership/history.md + REST /v1/partnerships/b31f183c-c953-44c8-bb97-dc668ffb874c/history.