DEPLOYDatabase

Revision history

Edged x Deep Fission (Nuclear SMR Data Center Power) revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Edged x Deep Fission (Nuclear SMR Data Center Power)

Recorded posture

  • First recorded event: 2025-01-15
  • Last material change: 2025-01-15

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/edged-x-deep-fission-nuclear-smr-data-center-power/history.md + REST /v1/partnerships/9b8a78ec-7fbf-47e4-b3d1-461080bd863b/history.