Revision history
ERC System x Rheinmetall x NRW revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-06-10
- Last material change: 2026-06-10
Material events (1)
- 2026-06-10: created (source: https://www.rheinmetall.com/en/media/news-watch/news/2026/06/2026-06-10-rheinmetall-erc-system-and-nrw-sign-mou-for-heavy-lift-drones) (reported)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/erc-system-x-rheinmetall-x-nrw/history.md + REST /v1/partnerships/73f4c125-be34-4c78-96d1-e2d047adc398/history.