DEPLOYDatabase

Revision history

Gamma 2 Robotics x Hexagon Safety and Infrastructure revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Gamma 2 Robotics x Hexagon Safety and Infrastructure

Recorded posture

  • First recorded event: 2026-08-22
  • Last material change: 2026-08-22

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/gamma-2-robotics-x-hexagon-safety-and-infrastructure/history.md + REST /v1/partnerships/f18e2931-edc6-4300-bf2a-3c3461d029e2/history.