DEPLOYDatabase

Revision history

Heron Power x Intersect (1.5 GW Heron Link capacity reservation) revision history

No events on file. Arc G is forward-only; the recorded event log accrues from Arc G adoption (2026-06-04). For the current state of this partnership see the partnership page.


Partnership

Back to Heron Power x Intersect (1.5 GW Heron Link capacity reservation)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/heron-power-x-intersect-heron-link-capacity-reservation-2026/history.md + REST /v1/partnerships/57b82392-8d42-49fb-bd53-fe416216a70f/history.