DEPLOYDatabase

Revision history

inOrbit x Mobile Industrial Robots MiR revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to inOrbit x Mobile Industrial Robots MiR

Recorded posture

  • First recorded event: 2026-08-22
  • Last material change: 2026-08-22

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/inorbit-x-mobile-industrial-robots-mir/history.md + REST /v1/partnerships/43e18779-12bd-4f0b-b686-bc2fb5b0dd01/history.