DEPLOYDatabase

Revision history

Keel Infrastructure and Vertiv Moses Lake AI data center revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Keel Infrastructure and Vertiv Moses Lake AI data center

Recorded posture

  • First recorded event: 2025-11-13
  • Last material change: 2025-11-13

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/keel-infrastructure-x-vertiv-moses-lake/history.md + REST /v1/partnerships/80c0921f-3702-45f4-a9e7-62cb2e4f8c35/history.