Revision history
LIG Nex1 x Shield AI (V-BAT + L-MDM Drone Missile Integration) revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Back to LIG Nex1 x Shield AI (V-BAT + L-MDM Drone Missile Integration)
Recorded posture
- First recorded event: 2026-01-22
- Last material change: 2026-01-22
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/lig-nex1-x-shield-ai-v-bat-l-mdm-drone-missile-integration/history.md + REST /v1/partnerships/18b3e638-dddf-4d78-8823-5e3f83ba4b2b/history.