DEPLOYDatabase

Revision history

Lincoln Electric x FANUC revision history

Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.


Partnership

Back to Lincoln Electric x FANUC

Recorded posture

  • First recorded event: 2023-01-01
  • Last material change: 2023-01-01

Material events (1)

  • 2023-01-01: created (source: https://crx.fanucamerica.com/cobot-and-go/cooper-crx10ial-welding-cobot) (verified)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /partnerships/lincoln-electric-fanuc-cooper/history.md + REST /v1/partnerships/5c8d4dcd-8ffb-47bc-907e-5806c6c1afc3/history.