Revision history
MISTRAS Group x Batchelor and Kimball Data Center Inspection revision history
Append-only Arc G field-change log. 1 material event; 0 editorial events. Newest first.
Partnership
Back to MISTRAS Group x Batchelor and Kimball Data Center Inspection
Recorded posture
- First recorded event: 2025-09-09
- Last material change: 2025-09-09
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/mistras-group-x-batchelor-and-kimball-data-center-inspection/history.md + REST /v1/partnerships/e51925cb-cc1e-47b5-99f7-9681e94e609a/history.